Contents
Method of a study
- Terms of reference: need (energy, power, profile, quality, reliability), site constraints, budget, horizon.
- Data: weather (Site weather data module), consumption records, characteristics of the existing network, prices.
- Variants: at least two technically correct solutions (centralised / decentralised, 24 / 48 V, PV / hybrid…).
- Calculations: sizing, wiring, load flow and short circuit if a network is involved, economics.
- Sensitivity: on the uncertain assumptions (prices, rates, demand growth, resource).
- Reasoned recommendation and traceable design note (assumptions, methods, results, standards).
Case 1 — Electrification of a village (centralised system or individual kits?)
Data
| Users | Number | Needs per user | Wh/d |
|---|---|---|---|
| Households | 150 | 3 lamps 7 W (5 h), television 50 W (4 h), fan 40 W (6 h), charger 10 W (2 h) | 565 |
| School | 1 | 6 lamps 15 W and 2 computers 60 W (4 h, in the morning) | 840 |
| Health post | 1 | as example 3.3 of level 3 | 3 390 |
| Millet mill | 1 | 3 kW motor, cos φ 0.8 (3 h, in the morning) | 9 000 |
Site: Dakar (locations database). LV network of the centralised system: 30 m per customer, 6 000 kF/km, maintenance 60 kF/km/yr. Current imposed
equipment (400 Wp module, 12 V 200 Ah AGM battery, 60 A MPPT controller, 1.5 kVA inverter; prices of level 3). Centralised: 48 V bus; individual kits:
12 V bus. Discount rate 8 %, inflation 3 %, 20 years. File: exemples/pv_village.nxpv.
Reference results
| Centralised (48 V + LV network) | Decentralised (153 systems) | |
|---|---|---|
| Needs | 98.0 kWh/d; peak 13.7 kVA | |
| PV array | 84 modules, 33.6 kWp | 400 Wp per household; 3.2 kWp for the mill |
| Batteries | 260 (4 × 65) | 2 per household; 24 for the mill |
| LV network | 4.59 km, 27.5 MF | — |
| Investment | 95.2 MF | 204.2 MF |
| Discounted cost (20 years) | 192.6 MF | 368.0 MF |
| Levelised cost of the kWh | 549 F/kWh | 1 048 F/kWh |
Analysis
- The centralised system costs half as much per kWh despite the LV network: a single inverter and a single battery bank pool the peaks (diversity), and the mill, very poorly served by a 12 V kit, benefits from the common bank.
- The wiring of the 48 V centralised system reveals its limit: the 28-string array delivers 380 A at 93 V; a single 30 m link would require 2 × 300 mm². In practice the array is split between several controllers placed near the junction boxes, or a higher-voltage bus is chosen: a point to address in the design note.
- Individual kits remain relevant for very scattered dwellings (network > 100 m per customer): redo the study with 0.1 km per customer.
- Extension: replace part of the batteries by a genset (economic dispatch, level 5) and compare.
Case 2 — 500 kWp PV plant connected to the MV network
Data
64 strings of 20 modules of 400 Wp (512 kWp; 620 V per string), 8 junction boxes of 8 strings, 8 inverters (500 kVA in total), 0.4/30 kV transformer 30 m from the inverters. Cost excluding wiring 400 kF/kWp; operation 8 kF/kWp/yr; inverters replaced at 12 years (20 MF); yield 1 581 kWh/kWp/yr (example 3.5), degradation 0.5 %/yr; 25 years, discount rate 8 %, inflation 3 %.
Wiring (calculated by NRJXpert, 40 °C, grouping 0.8)
| Link | Length | Cable | Protection | ΔU | Cost |
|---|---|---|---|---|---|
| String → junction box (×64) | 40 m | 2 × 4 mm² Cu | 20 A | 0.99 % | 86.6 kF each |
| Box → inverter (×8) | 30 m | 2 × 70 mm² Cu | 160 A | 0.34 % | 604 kF each |
| Inverters → transformer | 30 m | 4 × (3 × 240) mm² Cu | 800 A | 0.37 % | 11.4 MF |
| Total wiring (9.6 % of the investment) | 21.8 MF | ||||
In aluminium, the AC link becomes 4 × (4 × 240) mm² Al for 6.9 MF: a saving of 4.5 MF. The box → inverter link is sized by heating (the voltage drop alone would require 25 mm²).
Economics
| Feed-in tariff | NPV (MF) | IRR | Payback |
|---|---|---|---|
| 35 F/kWh | −6.1 | 7.7 % | 9.9 years |
| 40 F/kWh | +35.3 | 9.9 % | 8.4 years |
| 45 F/kWh | +76.8 | 12.1 % | 7.3 years |
Investment 226.6 MF; production 809 MWh in the first year; LCOE 35.7 F/kWh: this is the minimum tariff. At 35 F/kWh, a subsidy of 2.7 % is enough.
To be completed by the student: study of the connection to the MV feeder (load flow: voltage rise at the connection point, hosting capacity, level 5) and contribution to the short-circuit current (IskPF of the inverters).
↑ Back to topCase 3 — Delivery substation and industrial installation
Data
30 kV network with a short-circuit power of 250 MVA; 1 000 kVA, 30/0.4 kV, Dyn11 transformer, usc = 6 %, Psc = 10.5 kW; 600 kW factory at cos φ = 0.8; one 30 kW motor (efficiency 0.9, cos φ 0.85) 80 m from the main LV switchboard.
Calculations
- Impedances referred to 400 V: upstream Za = 1.1 × 400²/250·10⁶ = 0.704 mΩ (X = 0.995Z, R = 0.1X); transformer Zt = 9.60 mΩ, Rt = 1.68 mΩ, Xt = 9.45 mΩ.
- Short circuit at the main switchboard: R = 1.75 mΩ, X = 10.15 mΩ; I"k3 = 1.05 × 400/(√3 × 10.30 mΩ) = 23.5 kA; κ = 1.60; ip = 53.4 kA. Main breaker 1 600 A (transformer In 1 443 A), breaking capacity ≥ 25 kA, making capacity ≥ 53 kA.
- Motor feeder: I = 30 000/(0.9 × 0.85 × √3 × 400) = 56.6 A; cable chosen by NRJXpert 4 × 16 mm² Cu (ΔU 2.55 %, 63 A protection). Short circuit at the end: I"k3 = 2.10 kA; minimum phase-to-phase (c = 0.95) ≈ 1.65 kA. A 63 A D-curve breaker (magnetic tripping up to 14 In = 882 A) protects the line well.
- Compensation: to go from cos φ = 0.8 to 0.93: Qc = 600 × (0.750 − 0.395) = 213 kvar; S goes from 750 to 645 kVA, the current from 1 083 to 931 A: the transformer regains 14 % of margin.
In NRJXpert
Draw: equivalent generator of the network (Rd, Xd referred to 400 V), three-phase transformer (Network palette, 1 000 kVA, 30 kV/400 V, usc 6 %, Psc 10.5 kW, Dyn), 80 m line (r = 1.406 Ω/km, x = 0.08 Ω/km), fault at the main switchboard then at the motor. Compare the I"k with the values above. Reminder: the server does not represent the transformation ratio; all impedances are referred to 400 V.
Case 4 — Wind pumping on the northern coast (Saint-Louis)
Data
Wind at 10 m: Weibull c = 6.0 m/s, k = 2.4; roughness 0.03 m; ρ = 1.18 kg/m³. 10 kW wind turbine (curve of example 3.7), hub at 24 m, losses 6 %. Need: pumping of 60 kWh/d on average for market-garden irrigation.
Results
Wind at hub height: c = 6.90 m/s, mean 6.12 m/s, power density 220 W/m². Mean power 3.11 kW; net production 25.6 MWh/yr, i.e. 70 kWh/d on average; capacity factor 29 %. One machine covers the need on an annual balance (0.85 machine). But the wind weakens in the rainy season: check month by month (tab 4 of the wind window) and store water rather than electricity (tank of 2 to 3 days of consumption, far cheaper than a battery bank).
To be completed: wiring of the machine (tab 5, 24 m tower + 30 m), economic study compared with a diesel motor-pump, and PV + wind variant (seasonal complementarity).
↑ Back to topCase 5 — Solar water pumping for a village (borehole and water tower)
Data
Village of 500 inhabitants (50 l/inh/d, i.e. 25 m³/d), borehole with a TDH of 15 m, irradiation 5 kWh/m²/d, submersible centrifugal pump (ηp = 0.5, ηm = 0.85),
array losses 10 %, pumping over 9 h. File: pompage_village.nxpomp (Help › Open a tutorial example…).
Results
Pumping energy 2 404 Wh/d; peak power 534 Wp (energy method) or 583 Wp (power method); 420 W motor-pump. The hourly simulation shows that 6 modules (600 Wp) cover only 86 % of the demand: the selected array is 9 modules of 100 Wp (100 % coverage), with a 50 m³ tank. With the prices of the supplied database (November 2026) and the default economic parameters, the cost per m³ is about 126 F against about 270 F with a diesel motor-pump providing the same service.
To be completed: choice of the pump in the database (“Pumps” tab), sensitivity to the TDH and to the design margin (10 % by default), battery variant (628 Wp by the formula, but a higher cost per m³), and maintenance plan (pump replacement every 8 to 10 years).
↑ Back to topDesign note template
- Purpose of the study, client, reference and revision index.
- Documents and standards: NF C 15-100, UTE C15-712-1, IEC 60909-0, IEC 61400-12-1, IEEE 1547; terms of reference.
- Input data: site, weather (source and period), needs (table of appliances), network, prices (date of the quotations).
- Assumptions: efficiencies, safety factors, temperatures, lifetimes, discount and inflation rates.
- Methods: formulas or software (NRJXpert, version and project files attached).
- Results: sizing, wiring (table of links), short-circuit currents and protection, voltage profile, costs.
- Checks: hand calculation of at least one result of each type; differences explained.
- Sensitivity and risks.
- Conclusion and recommendation; reservations.
Author
November 2026